This project was carried out by an expert Deconstruct UK team and consisted of two structures which formed part of a long terrace of high end residential premises, the façades had to be retained and the entire structures behind had to be removed.

This six storey development also had a basement and throughout its life had been subject to a number of previous conversions.

Due to the location and nature of the adjoining tenancies, noise and vibration from the works were a particular concern and had to be managed.

Limited access to the rear of the project for the removal of materials and delivery of temporary works also proved a logistical factor that required close management to ensure our works did not cause a neighbourly issue.

Location of mobile cranes for the installation of the temporary works were equally important.

To find our more about this project, download the case study here.

For further information on our Asbestos Removal, Demolition and Deconstruction services, please call us now on 020 7734 6655 or visit www.deconstructuk.com.

If you would like to keep up to date with all our latest projects please subscribe to our blog RSS feed.