Deconstruct team carry out full decontamination of the boiler room at a Private Hospital

Download PDF

Here at Deconstruct our team was  appointed to carry out a full decontamination of the main boiler house that served the entire hospital.

Asbestos had been removed from the boiler house previously, but works had been carried out to a very poor standard so residual contamination remained.

The Deconstruct team had to carefully clean around all plant, pipework and electrical switch gear to enable the hospitals engineers to work safely within the boilerhouse, without the risk of exposure to asbestos fibres.

The work area contained many pipes and cables that all had to be cleaned. Careful separation and cleaning of the cables, a slow and labour intensive process was necessary.

For more information on this project, the challenges and how we completed the works, download the case study here.

For further information on our Asbestos Removal, Demolition and Deconstruction services, please call us now on 020 7734 6655 or visit www.deconstructuk.com.

If you would like to keep up to date with all our latest projects please subscribe to our blog RSS feed.