Temporary Works – Case Study Round-Up

Download PDF

Here at Deconstruct we specialise in temporary conditions, – we design, fabricate, install and remove Temporary Works Schemes.

We deliver this by understanding the permanent solution fully before we design a temporary resolve. This can be done through a number of construction techniques and materials, most commonly fabricated temporary steelwork, modular or proprietary systems and design scaffolds. The timely introduction of a permanent steel or concrete frame influences cost and programme and is very much Deconstructs first consideration.

We have produced a number of Case Studies to demonstrate our work to date, click on the links below to download these:

Trocadero_PiccadillySt_Pats_Deconstruct_case_study

 

 

 

 

 

#

 

 

View more Temporary works case studies here.

Deconstruct design systems that when installed in line with our bespoke Coordination Manual, ensure our clients can be assured our quality control and checking provides the highest of standards to maintain safe delivery of their project. HSE Guidance in this respect is found through this useful link: http://www.hse.gov.uk/foi/internalops/sectors/construction/021004.htm

Submit an enquiry or call us today 020 7734 6655