Customise consent preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site.... 

Always active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Back to projects

Major Capital Works (RBKC)

Location

London SW3

Sector

residential

Nature

primary principal designer and Health & Safety advisor (4-5 year framework)

Value

£ in excess of 100 million across several dozen projects

Employer

Royal Borough of Kensington and Chelsea (RBKC)

Delivered by

de-risk logo

Project details

Derisk were appointed as primary principal designer and health & safety advisor to RBKC for the construction works carried out by the Major Capital Works team. Council assets undergoing works range from single residential properties and  supported and residential housing to whole estates and tower blocks.

Notable projects to date include:

Trellick Tower — installation of new wet riser system

Dry Riser installation programme to 38 blocks across the borough Henry Dickens Court estate — external refurbishment, re-roofing and communal area lighting upgrades

Swinbrook Road estate — external refurbishment, re-roofing and to common areas.

 

Scope of works

Construction works comprised repairs and decorations to the external fabric of buildings, internal communal and estate areas, including window, door and roof repairs or replacement.

Engineering works undertaken by the M&E Team to date include CCTV installations, wet and dry riser installations and upgrades, fire alarm installations, warden call system installation and sprinkler upgrades.

Derisk deliver a variety of services as principal designer and client CDM advisor. Many of our CDM advisor services are delivered for no additional charge, affording RBKC much added benefit from the competent health & safety services provided.

Our roles included:

  • delivering CDM training sessions to the project management team planning, managing and monitoring the pre-construction phase
  • ensuring that, where reasonably practicable, risks were eliminated or controlled through design work. We monitor and organise design risk workshops at agreed project work stages
  • producing a coordinated design risk register showing identified risks throughout the construction phase
  • carrying out design reviews and focused workshops on selected packages to ensure that design risk management continues throughout the construction phase
  • ensuring cooperation and coordination through a pre-planned design phase including all design disciplines
  • ensuring designers comply with their duties and that design risk workshops address all design disciplines
  • ensuring that all parties fully identified and eliminated risks arising from their designs assisted the client in preparing the pre-construction information pack and the Health and Safety file
  • reviewing and commenting on contractor’s RAMS and construction phase plans
  • reviewing welfare proposals to ensure compliance with schedule 2, CDM 2015
  • undertaking competency checks on designers and contractors issuing and updating F10 notifications.