Customise consent preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site.... 

Always active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Back to projects

Stanhope Gate

Location

5-6 Stanhope Gate

Sector

residential

Nature

tender scheme proof of concept for demolition and enabling project through to full design and fabrication package, installation support, and coordination

Employer

Erith

Delivered by

de-cs logo

Project details

Façade retention and three-storey post-demolition basement works.

Scope of works

This project required piled supported façade retention to facilitate a three-storey basement and extension into the street. Top-down basement construction was part-propped, including infill plank design to the perimeter wall, where piles could not be installed, along with grouting for localised soil stabilisation.

Additional requirements included formed piling platforms raised to four metres, along with plunge column braced crane grillage. De Construction Solutions also provided propping and general temporary works engineering support during both the demolition phase and the new build scheme.

 